1000DF00333 Issue 6
11/38
The pole clamp is fitted to the rear of the pump and will provide secure fixing to vertical I.V. poles of a diameter between 15 and 40 mm.
*
*
Pole Clamp Installation
The rotating cam can be fitted to the rectangular bar on the Docking Station/Workstation* or the equipment rail measuring 10 by 25 mm.
1.
Align the rotating cam on the rear of the pump with the rectangular bar on the Docking Station/Workstation* or the equipment rail.
2.
Hold the pump horizontally, push the pump firmly onto the rectangular bar or equipment rail.
Ensure that the pump 'clicks' securely into position onto the bar.
3.
To release, push the release lever and pull the pump forwards.
*Alaris® DS Docking Station and Alaris® Gateway Workstation.
Docking Station/Workstation* or Equipment Rail Installation
Rectangular bar
Rotating cam
Release lever (push to release)
Getting Started (continued)
1.
Pull the folded pole clamp towards you and unscrew the clamp to
leave enough room for the size of the pole.
2.
Place pump around pole and tighten screw until the clamp is
secured to the pole.
w
Ensure the pole clamp is folded away and stored
within the recessed area at the rear of the
pump before connecting to a Docking Station/
Workstation* or when not in use.
Never mount the pump such that the IV infusion
stand becomes top heavy or unstable.
Recessed area
w
Do not mount the pump with the AC power inlet or the syringe pointing upwards. This could affect the electrical
safety in the event of a fluid spill or lead to the infusion of air which may be in the syringe.
w
Prior to each use, check the pole clamp:
• does not show any signs of excessive wear,
• does not show any signs of excessively loose movement in the extended, mountable position.
If these signs are observed, the pumps should be taken out of service for examination by qualified service personnel.