Initial start-up
WTS LARGE +0300131IT rel. 1.0 - 05.09.2022
»
Press
è
(switch on the pump)
»
Adjust the pressure at flush valve BV04 to 2 -2.5 bar, read on the pres- sure gauge immediately dowstream of
the pump (PI02*)
»
Let the system run for
5 minutes
» Press
ç
(close the flush valve SV02)
The permeate produced in this phase has not yet reached its final quality. However, a part of it can be used to thin the
antiscalant in the canister.
»
Let the unit run for 10 minutes in this mode and continue with the adjust- ment of the recovery rate.
»
Press
è
(switch off the pump)
»
Press
é
(close the water inlet valve SV01)
» Press
2x "ESC"
(leaving the service level).
The system starts the permeate production.
8.2 Adjustment of the permeate quality
Adjust the circulation volume
(BV02)
and the concentrate volume
(BV03)
to achieve the optimum recovery and
permeate value (see technical data). The flow rates can be read off the flow measuring sensors FI01 (permeate) / FI02
(circulation) and FI03 (concentrate).
Using the example of ROL-1000:
Circulating flow rate: 450 l/h
Concentrate flow rate: 470 l/h
This results in a recovery value of 68 percent.
In general, this is calculated as follows:
RECOVER (%) = permeate*
x 100
permeate* + concentrate*
* quantity
Notice:
• When using an upstream softening system you can reduce the amount of concentrate (lower water consumption) until a
recovery value of 75% is achieved.
• Please also note the information on the correction value (chapter 4.2).
• Use the red markings to document the required flow rates
Notice:
If the permeate quantity (Fl01) is within the specified range (see technical data), continue with chapter 8.3
Fl01
permeate flow meter
Fl02
recirculation flow meter
Fl03
drain flow meter
BV02
manual recirculation control valve
BV03
manual drain control valve
BV04
manual flushing control valve
SV02
flushing solenoid valve
D
permeate conductivity probe
E
attachment for sampling permeate
Fl03
BV03
BV04
SV02
E
D
BV02
Fl02
Fl01
Summary of Contents for Large ROL 160-1K2
Page 2: ......
Page 6: ......
Page 43: ...43 ENG Control WTS LARGE 0300131IT rel 1 0 05 09 2022...
Page 59: ...59 ENG Spare parts WTS LARGE 0300131IT rel 1 0 05 09 2022 20 21 22 23 24 25 26 27 28 29 30...
Page 65: ...Notes...
Page 66: ...Notes...
Page 67: ......