27
ENG
“ultimateSAM - user” +0300070IE - rel. 1.0 - 23.05.2013
8
Place the upright in the 100 mm
(3.9”)
opening made in the duct
9
Tighten the support fl ange bolts to 7-8Nm (5-6ft), using the fastening elements supplied.
If necessary, cut the bolts
1
0
View of the installation, part inside the duct: upright
11
View of the installation, part outside of the duct: manifold
12
Apply the AHU wall cover kit for SA0 (not supplied, available separately): SAKIL00000
Installation of the condensate drain kit for SA0 (single-pipe)
(optional, sold separately) SACK*S10*0
Installation of the thermostatic drain kit for SA0 (single-pipe)
(optional, sold separately) SAKT*H00*0
Summary of Contents for ultimateSAM
Page 2: ......
Page 4: ......
Page 6: ......
Page 28: ...28 ITA ultimateSAM user 0300070IE rel 1 0 23 05 2013 Note ...
Page 30: ......
Page 32: ......
Page 54: ...28 ENG ultimateSAM user 0300070IE rel 1 0 23 05 2013 Note ...
Page 55: ......