EN
www.carlisleft.com
77
-
3345 R1.1 (06/2022)
17 / 62
3. Installation instructions:
To ensure a trouble free operation of the Binks E420 applicator it is very important that the unit is
properly installed on the robot. It is also very important that the function of the applicator is carefully
checked before start up.
Installation of the Binks E420 applicator
Following parts are normally required:
1 piece. Binks E420 applicator with nozzle head and nozzle cap.
1 piece. Robot mounting flange.
1 piece. Swivel locking bracket.
1 piece. Cable with 5
-
pin or 18
-
pin connector (other configurations possible).
3 piece. Nozzles
(See accessories list 9836 4139 02 for available options)
Before starting installation of the Binks E420
applicator, always read chapter 2: Descrip-
tion, in order to be familiar with the various
parts of the applicator.
NOTE
Be especially careful when connecting the
high pressure material supply system and
always keep clear of the nozzles when test
spraying.
WARNING
!