Page | 12
Then, slide the front sleeved edge of the wall
panel upward onto the front vertical pipe.
Once the wall panel material is over
both the bottom and front pipes, re-
install the “L” fitting.
Tighten the connector, then attach the
hook-and-loop fasteners that wrap
around corner.
Once the “L” fitting is
reinstalled, slide the
front sleeve to the top of
the frame and secure
with one bungee.
Stretch the bottom
sleeve to the back of the
frame, then up to the top
and secure with one
bungee.