Carpenter Model 59 Wire Prefeed & Dereeler
Carpenter Model 59 Wire Prefeed & Dereeler
•
Phone
: (315) 682-
9176 •
Fax
: (315) 682-9160
Website
: www.carpentermfg.com •
: wire@carpentermfg.com
Revised 09/27/2021
Page 13
Figure 7
:
Material Spool Correctly Loaded onto Dereeler Axel Assembly
Loading Material into the Model 59
Follow the steps below to load material into the Model 59. Refer to Figure 6 above to
aid in parts identification.
1. Manually pull approximately twenty-five (25) feet of material from the material
spool. Open the upper and lower PN 5549 cams that cover the PN 5333
accumulator pulleys.
2. Thread the material around the PN 5333 accumulator pulleys. Refer to Figure 8
through Figure 10 below for three material routing options.
a. The Model 59 is supplied with (1) PN 5522 1.25-pound pulley weight,
attached to the lower (4) PN 5333 accumulator pulleys. This weight is
designed to aid in processing solid conductor, rigid multi-conductor, or
large AWG stranded wire. Due to the rigid construction of these types of
materials it may be necessary to use only one set of the PN 5333
accumulator pulleys (i.e. threading material around only once [refer to
Figure 10 below]).
b. The Model 59 allows for an optional PN 5521 2.5-pound pulley weight.
This is for use when processing the heaviest, most-rigid material
appropriate for the Model 59.