Installation of Main Frame
Insert the main frame to the side frame(fin of the main frame came to
gutter side)and screw on the beam using the guide hole.
Screw the side frame to the main frame.
front frame
side
front frame
side
gutter
side
gutter
side
When screwing the main frame, be sure not to nip the tight
rubber with the screw head.
drilling screw
drilling screw
drilling screw
guide hole
beam
beam
front frame
main frame
main frame
fin
side frame
gutter
post
(depth set)
(depth set)
tight rubber
Installation of Main Frame in case Post is Moved
See the Ushaped gutter of the beam and make the φ5.2 hole on the main frame and screw it on the body
(picture A).
In case of installing the main frame other than post standard position, put the seal on the unnecessary hole
(picture B).
main frame
main frame
U shaped gutter
U shaped gutter
seal
(parts box)
Summary of Contents for KDR Series
Page 20: ...N10 02 ...