2-6
Axxius 800 - Release 2.2
Physical Installation
Rack Mounting
To maintain proper convection cooling, maintain at least 1/2 RU between the Axxius
and any other equipment (each Axxius occupies 3 RU of rack space). Therefore, if one
Axxius is mounted above another Axxius, then there would be a total of 1 RU between
them (1/2 RU above the lower unit and 1/2 RU below the upper unit).
Using the 1/2 RU airspace guideline, up to 15 Axxius 800 units may be installed in a
7’ equipment rack.
}
Axxius = 2 RU
Spacing = 1RU
1
2
3
4
5
7
8
9
10
11
12
13
14
15
6
(1/2 above 1/2 below)
1/2 RU free space
1/2 RU free space
1/2 RU free space
1/2 RU free space
Summary of Contents for Network Device Axxius 800
Page 1: ...Axxius 800 USER MANUAL Part Number 770 0104 AG Product Release 2 2 May 2004 ...
Page 32: ...xxxii Axxius 800 Release 2 2 Table of Contents ...
Page 50: ...1 18 Axxius 800 Release 2 2 Base Platform ACO ...
Page 101: ...CHAPTER CLI Commands In this Chapter n Command Line Interface Help n CLI Commands ...
Page 392: ...8 8 Axxius 800 Release 2 2 FXO Voice Card Channel Associated Signaling CAS Conversions ...
Page 430: ...12 8 Axxius 800 Release 2 2 Power Supply Installing Replacing a Power Supply ...
Page 472: ...15 20 Axxius 800 Release 2 2 Terminal Server Router Card LEDs ...
Page 500: ...18 12 Axxius 800 Release 2 2 Maintenance Hot Swap Service Card ...
Page 532: ...C 22 Axxius 800 Release 2 2 Loopback Tests V 35 V 54 Loop ...
Page 552: ...Glossary 20 Axxius 800 Release 2 2 Glossary ...