1-7. LEVELING
1-7-1. Fill a clear vinyl hose with water, checking that there are no air bubbles in the hose.
1-7-2. Using point A as the reference point, measure the difference in the water level at the other
points (B, C and D).
A
B
(Evaporator side)
(Absorber side)
C
D
A
B
C
D
0 mm
mm
mm
mm
1-7-3. Leveling calculation as shown.
A-B
C-D
A-D
B-C
A-C
B-D
L
L
L
L
W
W
Tolerance <
L : Chiller length
W : Chiller width
1-7-4. Note that there are four leveling check points on the chiller labeled A, B, C and D
in the sketch below. These check points are designated by three punch markers
on the tube sheet or shell of the lower shell.
2
1000
10
Summary of Contents for LJ
Page 1: ...Absorption Chiller INSTALLATION MANUAL LJ Model ...
Page 26: ...Fig 1 11 7 23 ...
Page 30: ... marks are the positions measured by the megger 27 ...
Page 36: ...33 ...
Page 37: ...34 ...
Page 46: ...13 Sampling of absorbent Sampling of absorbent Finished Unfinished 43 ...