1-12. INSULATION
After the Chiller has been installed, it must be insulated.
1-12-1. Before installing insulation, the Chiller should be placed in its permanent position.
1-12-2. To mount insulating materials, use bonding agents, iron wires, and bands.
1-12-3. Insulation on outer equipment and flange sections should be mounted so that it can be
removed easily.
1-12-4. The drawings show the areas to be insulated and the recommended insulating materials
and procedures. Please refer to
Exhibit LG
.
1-12-5. Material of insulation :Fiber glass
Coeffcient of thermal conductivity :about 0.04kcal/mh
º
C
24
Summary of Contents for LJ
Page 1: ...Absorption Chiller INSTALLATION MANUAL LJ Model ...
Page 26: ...Fig 1 11 7 23 ...
Page 30: ... marks are the positions measured by the megger 27 ...
Page 36: ...33 ...
Page 37: ...34 ...
Page 46: ...13 Sampling of absorbent Sampling of absorbent Finished Unfinished 43 ...