2–11
T-375
Figure 2.11 Control Panel and Control Box
1) Water Temperature Gauge
2) Oil Pressure Gauge
3) Total Time Meter (TT)
4) Ammeter (A)
5) Intake Heater Switch (HS)
6) Ignition Switch (IGN)
7) Starter Solenoid Relay (SSR)
8) Safety Relay (S)
9) Intake Heater Relay (HR)
10) Circuit Breaker (CB2)
11) Circuit Breaker (CB3)
12) Circuit Breaker (CB4)
13) Starter Solenoid Timer (SST)
14) Intake Heater Timer (IHT)
15) Ground Studs
16) Electronic Governor Module (EG)
- - - - -
SST
HR
S
SSR
IHT
CB2
CB3
CB4
OFF
OFF
RUN
INTAKE AIR HEATER IGNITION
3
2
4
5
15
10
12
7
9
8
11
16
Mounted to
back of box
1
Control Panel
Control Box
13
14
6
Summary of Contents for 69UG15
Page 2: ......
Page 4: ......
Page 12: ......
Page 32: ......
Page 40: ......
Page 58: ......
Page 60: ...T 375 6 2 Figure 6 2 Schematic for 12 VDC Control Circuit 12 VDC Control Circuit ...
Page 61: ...6 3 T 375 Figure 6 3 Schematic High Voltage Circuitry High Voltage Circuitry Receptacle Box ...
Page 62: ......
Page 65: ......