1.
Figure 1.5 - Power Harness Installation
a. Remove the pass-through grommet on the control box as shown and install the 22-03090-00
harness.
Ground
1RP
SP81B butt
connector (
s
witched
12 VDC power)
SP81A terminal
(
a
witched 12
VDC power)
SP80B Connect
to fuel heat
(
c
onstant 12 VDC
power)
5
A
mp fuse
holder
Pass-through
grommet
SATPWR
1.4.1 Power Harness Installation
For Supra 5
60
,
6
60
,
7
60
,8
60
, 950MT and 960 units prior to serial number TFP91605321, install
power harness (22-03090-00) as follows:
Figure 1.6 - Remove Pass-through and Install Harness
b. Locate/disconnect the 1J plug on the relay board and then locate pin 12 on the connector
(950MT uses
3J-12).
Remove pass-
through
grommet
Install harness
22-03090-00
5
62-12110
Summary of Contents for eSolutions Supra 550
Page 2: ......
Page 6: ......
Page 36: ...3 1 eSolution Wire Harness 30 62 12110 ...
Page 37: ...3 2 eSolution Wire Harness 31 62 12110 ...
Page 38: ...32 62 12110 ...