T-374
6–6
NOTE
The flat side of the ribbon is pressed into the track.
3. Use retaining clips to align the polysheet curtain line on the curtain into the track across the top of the
container. Using the line will keep the curtain square.
4. Unroll the curtain ribbon and mark the mid-point.
5. At the midpoint of the ribbon, insert the curtain ribbon into the ribbon channel at the “CENTER” arrow on the
curtain.
6. Press the ribbon into the back of the curtain track and seat the front of the ribbon into the track by pushing
on the outer edge of the track.
NOTE
Use care when removing the retaining clips to avoid damaging (tearing) the curtain.
7. Insert the curtain into the side channels and across the bottom rail using the retaining clips as required.
Make sure the curtain is stretched tight across the opening. Eliminate any folds or wrinkles that can lead to
air leakage.
Summary of Contents for EverFRESH
Page 14: ......
Page 22: ......
Page 30: ......
Page 56: ...T 374 5 26 4 Note the orientation of the check valve 5 Reinstall in reverse order ...
Page 64: ......
Page 66: ......
Page 67: ...8 1 T 374 SECTION 8 SCHEMATICS DIAGRAMS STANDARD UNITS Figure 8 1 Legend Standard Units ...
Page 68: ...T 374 8 2 Figure 8 2 Schematic Standard Units Page 1 ...
Page 69: ...8 3 T 374 Figure 8 3 Schematic Standard Units Page 2 ...
Page 70: ...T 374 8 4 Figure 8 4 Wiring Diagram Standard Units ...
Page 72: ...T 374 9 2 Figure 9 2 Schematic Units with CO2 Injection Page 1 ...
Page 73: ...9 3 T 374 Figure 9 3 Schematic Units with CO2 Injection Page 2 ...
Page 74: ...T 374 9 4 Figure 9 4 Wiring Diagram Units with CO2 Injection ...
Page 99: ......