T-372
7–40
4. Cut all the wire ties (see
) that are securing the sensors to the harness and remove sensor.
Figure 7.25 Return Sensors - Cutting Wire Ties
GDP Calibration, Perform Calibration:
1. Connect the interrogator cable to the interrogator port. Then, power on the unit.
WARNING
!
Before powering on the unit, it is important to ensure that all dismantling work is done and
tools are away and service personnel are not working on the unit at the time of power on.
2. Open DataLINE version 3.1 or above. From the DataLINE launch pad, click on the Probe Calibration button
(see
) to go to the Probe Calibration screen. A pop-up window will appear reminding the user to
ensure proper ice bath temperature. Click OK to acknowledge.
Figure 7.26 DataLINE - Probe Calibration