1 - RECEIVING THE UNIT
1.1 - General checks
■ Each unit has a data plate bearing an identification number. This number must
be included in all correspondence. Ensure that it is the correct unit by checking
the purchase order.
■
After unpacking the unit, please inspect it for any damage.
■
If any items are missing or in case of damage, specify this on the delivery slip
and inform the carrier by registered letter within 3 days of delivery of the unit.
1.2 - Unloading
■
The recipient shall be responsible for unloading the equipment and providing
the necessary handling equipment (see the section entitled "LIFTING
INSTRUCTIONS").
2 - SAFETY INSTRUCTIONS
■ Any operation must be carried out by qualified personnel using the appropriate Personal Protective Equipment (PPE).
■
Before any operation, read this guide carefully and keep it in a safe place. Safety information must be adhered to.
■
The units must not be run under operating conditions which are more restrictive than those it was designed for (pressure,
temperature, type and circulation of fluids).
■
For units installed in European Community countries, ensure that the entire installation complies with the directives and
legislation in force.
■
Respect the instructions for using slings (see the labels on the unit).
■
To prevent any risk of accident, prohibit public access by clearly marking the work area.
2.1 - In an emergency
■
Switch off the electrical supply.
■
The process should not be jeopardised if the emergency stop devices are activated.
■
Switch off the fans.
2.2 - The 4 main risks
■
Lifting or positioning = Accident
■
Contact with the piping = Burns
■ Opening the electrics box = Electrocution
■
Removing the grilles = Injury
4