7 - LOCATION
■
For structures with a "special" seismic risk, please consult us.
■ Before setting up the unit in its intended location, the installer must check the following points:
-
The unit must be installed outdoors in an area protected from flooding. Ensure that all conditions have been taken into account
(negative outdoor temperatures, corrosive atmosphere, altitude, etc.)
-
The ground surface or structure must be level and strong enough to bear the unit's weight.
-
Raise the unit if it is installed in a snowy area, in order to ensure a sufficient air intake height.
-
At the design stage, check that the installation location is compatible with the unit's sound level.
-
Protect the unit from sandstorms using the appropriate infrastructure.
-
Waste from vegetation is a major factor contributing to the clogging of the coil; avoid installing the unit close to deciduous trees.
-
Do not install the unit near hot air extraction duct outlets.
■
The installer must take all necessary precautions to limit the recycling of hot air and ensure a good air supply to the unit.
7.1 - Maximum permitted wind speed
■ Maximum permitted speed once the unit is secured to the floor: 100 Km/h
■ For speeds > 100 Km/h, contact us.
7.2 - Floor mounting
Fluid input side
Allow at least 3 support zones under each foot; these zones should all be stable and on the
same horizontal plane.
(Models 6, 10, 14, 18)
(Models 8, 12, 16, 20)
8