4. Water flow direction must be as specified in job flow dia-

grams or water flow markings on water boxes, and con-
nections must be to the correct entering and leaving wa-
ter box nozzles.

5. Install water box vent and drain piping in accordance with

individual job data. Air vents should be at all high points
in piping to eliminate water hammer.

6. Location of the chilled hot water and cooling water pumps

as well as the expansion tank must allow for the hydro-
static and water heads, to ensure that the total pressure
does not exceed the water box design working pressure.

7. A cooling tower bypass valve should be installed if the

cooling water temperature might fall below 59 F (15 C)
during chiller operation.

8. Install thermometer wells and thermometers on the en-

tering and leaving chilled/hot water pipes, absorber en-
tering and leaving cooling water pipes, and condenser leaving
cooling water pipe. Thermometer wells should extend into
the pipe a minimum of

1

3

pipe diameter.

9. Install pressure gage taps and pressure gages on the en-

tering and leaving chilled/hot water pipes and cooling wa-
ter pipes.

Fusible Plug Drain Piping

(Fig. 16)

1. Connect drain piping to discharge hot water to safe area.

2. Do not loosen or disconnect fusible plug while connect-

ing relief pipe to it.

3. Make sure connections to fusible plug are threaded and

allow easy piping removal for leak test and maintenance.

4. Install pipe hangers where needed to be sure no weight or

stress is placed on the fusible plug.

LEGEND

— PRESSURE GAGE

— THERMOMETER

— FLOW METER

— STRAINER

— CHECK VALVE

— MACHINE ENVELOPE

Fig. 15 — Piping Flow Schematic

Fig. 16 — Fusible Plug Drain Piping

11

Summary of Contents for 16DF013

Page 1: ...um or pressurized condition NEVER APPLY an open flame or live steam to a refrigerant cylinder Dangerous overpressure can result When necesary to heat a cylinder use only warm 110 F 43 C water DO NOT REUSE disposable nonreturnable cylinders or at tempt to refill them It is DANGEROUS AND ILLEGAL When cylinder is emptied bleed off remaining gas pressure loosen the collar and unscrew and discard the v...

Page 2: ...r model numbers and serial numbers are stamped on machine identification plates Check this information against shipping papers and job data Inspect Shipment Fig 1 Single piece machines are at a deep vacuum when shipped Do not open any valves until the vacuum has been noted Refer to Check Shipping Vacuum section below Machines shipped in 2 pieces are under nitrogen pressure Inspect for shipping dam...

Page 3: ... age the machine See Mounting the Burner section for burner rigging instructions Rigging 2 Piece Units PREPARATION Two piece units must be prepared for installation before they can be rigged 1 Open auxiliary evacuation valves to relieve pressure in absorber evaporator shell 2 Open shipping valve on generator assembly to relieve pressure 3 Remove all piping end plates by flamecutting the end plate ...

Page 4: ...Fig 2 16DF Views Typical V Lifting Holes Fig 3 Rigging One Piece Units Typical Top View 4 ...

Page 5: ...0 10 150 31 760 43 660 050 22 050 10 150 32 200 44 100 SI UNIT 16DF SHIPPING WEIGHT kg OPERATING WEIGHT kg Absorber Evaporator Low Temperature Generator Assembly High Temperature Generator Separator Assembly Total Weight 013 6 000 7 800 015 6 100 7 900 018 6 900 9 200 020 7 000 9 300 023 6 600 1800 8 400 11 300 025 6 700 1800 8 500 11 400 028 7 300 3900 11 200 14 800 032 7 500 3900 11 400 15 000 0...

Page 6: ...tor assembly first See Position and Level the Equipment section 3 Move the generator separator assembly into place beside the absorber evaporator assembly 4 Align connecting piping for generator separator and absorber evaporator assemblies Make sure serial numbers corre spond on both assemblies 5 See Mounting the Burner section for burner rigging instructions Position and Level the Equipment Isola...

Page 7: ...ak de tectors or equivalent If machine has acquired a leak in shipment or rigging all joints must be leak tested 6 After leak testing has been completed and leaks have been corrected release the machine pressure Machine Evacuation Removal of non condensables from the machine is required after machine has been opened To evacuate the machine proceed as follows 1 Connect auxiliary evacuation device F...

Page 8: ...high temperature insulating rope it must be wrapped around the flange circumference INSIDE of the mounting studs or bolt holes with overlapping ends to provide a complete gas tight seal Wrapping the rope around the outside of the studs or bolt holes could allow high temperature gas leakage through the holes in the attached plates Use either gasket cement or masking tape to hold the ropes in place ...

Page 9: ...iden tified with tags for suction supply and return lines The pip ing diagram with mounting dimensions and port sizes for your particular application is shown in the burner manual Oil supply and return connections are discussed under Con nect Fuel Piping in the Field Piping section of this manual FIELD PIPING Connect Water Piping Install piping using job data piping drawings and procedures outline...

Page 10: ... dam aged Fig 13 Mechanical Pressure Atomizing Light Oil Pump with External Regulating Relief Valve NOTES 1 Oil system schematic shown in high fire position 2 Supply pressure must not exceed 3 psi 20 kPa or pump seals may be dam aged Fig 14 Mechanical Pressure Atomizing Light Oil Pump with Integral Regulating Relief Valve 10 ...

Page 11: ...l thermometer wells and thermometers on the en tering and leaving chilled hot water pipes absorber en tering and leaving cooling water pipes and condenser leaving cooling water pipe Thermometer wells should extend into the pipe a minimum of 1 3 pipe diameter 9 Install pressure gage taps and pressure gages on the en tering and leaving chilled hot water pipes and cooling wa ter pipes Fusible Plug Dr...

Page 12: ...test indicate possible leakage do not apply insulation until leak has been corrected Most of the machine surfaces become hot during the heat ing cycle and those areas should be insulated with heat resistant material High temperature fire resistant material should be used in areas near the burner refractory door and exhaust All wiring should be external to the finished insu lation The insulation sh...

Reviews: