START-UP CHECKLIST FOR 50HCQA04-06 SINGLE PACKAGE ROOFTOP
HEAT PUMP
(REMOVE AND USE FOR JOB FILE)
I. PRELIMINARY INFORMATION
MODEL NO. ____________________________________________
JOB NAME _____________________________________________
SERIAL NO. ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have
b
een removed from unit (Y/N) _____
Verify installation of outdoor air hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and
b
elts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage
L1-L2_____________
L2-L3_____________
L3-L1_____________
Compressor Amps 1
L1 _____________
L2 _____________
L3 _____________
Compressor Amps 2
L1 _____________
L2 _____________
L3 _____________
Supply Fan Amps
L1 _____________
L2 _____________
L3 _____________
TEMPERATURES
Outdoor-air Temperature
_____________ °F DB (Dry Bul
b
)
Return-air Temperature
_____________ °F DB
_____________
°
F W
b
(Wet Bul
b
)
Cooling Supply Air Temperature
_____________ °F
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preced-
ing sections of this Installation Instruction document.
Summary of Contents for 50HCQA04-06
Page 22: ...22 Fig 36 Electro Mechanical Control Wiring 208 230v 460v ...
Page 23: ...23 Fig 37 Electro Mechanical Control Wiring 575v ...
Page 24: ...24 Fig 38 Electro Mechanical Power Wiring 208 230 1 60 ...
Page 25: ...25 Fig 39 Electro Mechanical Power Wiring 208 230 3 60 ...
Page 26: ...26 Fig 40 Electro Mechanical Power Wiring 460 3 60 ...
Page 27: ...27 Fig 41 Electro Mechanical Power Wiring 575 3 60 ...
Page 28: ...28 Fig 42 PremierLink Wiring Schematic 208 230 460v ...
Page 29: ...29 Fig 43 PremierLink Wiring Schematic 575v ...