EVAPORATOR TUBING ILLUSTRATION
EVAPORATOR TANK WRAP –
RH SIDE VIEW:
Evaporator inlet tube
on top row.
1.
Tank Wrap Inlet
2.
#2 Pass
3.
#3 Pass
4.
Thermostat Bulb Well
5.
Condensate Drain
NOTE:
TANK WRAP – FRONT SIDE
6.
#1 Pass
7.
#2 Pass
8.
#3 Pass
9.
#4 Pass
10.
#5 Pass
Upper evaporator coil
connections are on the
top, left back wall.
NOTE:
EVAPORATOR TANK WRAP –
RIGHTHAND REAR OF CABINET:
Capillary tube and heat exchange are
foamed in place. Three lines exit the
cabinet shell:
11.
1
⁄
4
" Process Line
12.
Capillary Tube
13.
Suction Line
If the capillary tube should ever become
restricted, the
1
⁄
4
" process tube can be
substituted as an evaporator inlet.
26
MAINTENANCE & REPAIR
1
1
1
1
2
2
2
2
3
3
3
3
4
4
4
4
5
5
5
5
6
6
6
6
7
7
7
7
8
8
8
8
9
9
9
9
1
1
1
1
0
0
0
0
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
1
1
1
1
3
3
3
3
Summary of Contents for 52-2038-01
Page 3: ...SECTION I Introduction...
Page 13: ...12 INTRODUCTION WIRING DIAGRAM 00 1667 00 CMCT 4 6 8...
Page 14: ...INTRODUCTION 13 WIRING DIAGRAM 00 1670 00 CMCT 10...
Page 15: ...14 INTRODUCTION WIRING DIAGRAM 00 1934 00 ECMCT 4 6 8 Export Models...
Page 16: ...INTRODUCTION 15 LAMP WIRING DETAIL Upper Raceway Typical...
Page 17: ...SECTION II Maintenance Repair...
Page 23: ...CONDENSING UNIT LAYOUT 24 MAINTENANCE REPAIR...
Page 32: ...UPPER CROSS SECTION CMCT Models...
Page 38: ...SECTION III Parts List...