background image

b. If building is constructed unusually tight, a permanent

opening directly communicating with the outdoors shall be
provided. (See item 2 below.)

c. If furnace is installed to obtain a return-air directly from

hallway or space adjacent to furnace, all air for combustion
must come from outdoors.

2. Air from outside the structure requires 1 of the following

methods:

a. If combustion air is taken from outdoors through 2 vertical

ducts, the openings and ducts MUST have at least 1 sq in.
of free area per 4000 Btuh of total input for all equipment
within the confined space. (See Fig. 6 and Table 2.)

b. If combustion air is taken from outdoors through 2 hori-

zontal ducts, the openings and ducts MUST have at least 1
sq in. of free area per 2000 Btuh of total input for all
equipment within the confined space. (See Fig. 6 and Table
2.)

c. If combustion air is taken from outdoors through a single

opening or duct (horizontal or vertical) commencing within
12 in. of the top of the confined space, opening and duct
MUST have at least 1 sq in. of free area per 3000 Btuh of
the total input for all equipment within the confined space
and not less than the sum of the areas of all vent connectors
in the confined space. (See Fig. 6 and Table 2.) Equipment
clearances to the structure shall be at least 1 in. from the
sides and back and 6 in. from the front of the appliances.

When ducts are used, they must be of the same cross-sectional area
as the free area of the openings to which they connect. The
minimum dimension of ducts must not be less than 3 in. (See Fig.
6.)

INSTALLATION

Step 1—Air Ducts

GENERAL REQUIREMENTS

The duct system should be designed and sized according to
accepted national standards such as those published by: Air
Conditioning Contractors Association (ACCA), Sheet Metal and
Air Conditioning Contractors National Association (SMACNA) or
American Society of Heating, Refrigerating and Air Conditioning
Engineers (ASHRAE) or consult factory The Air Systems Design
Guidelines 
reference tables available from your local distributor.
The duct system should be sized to handle the required system
design airflow CFM at the design external static pressure.

When a furnace is installed so that the supply ducts carry air to
areas outside the space containing the furnace, the return air must
also be handled by a duct(s) sealed to the furnace casing and
terminating outside the space containing the furnace.

Secure ductwork with proper fasteners for type of ductwork used.
Seal supply- and return-duct connections to furnace with code
approved tape or duct sealer.

Flexible connections should be used between ductwork and
furnace to prevent transmission of vibration. Ductwork passing
through unconditioned space should be insulated to enhance
system performance. When air conditioning is used, a vapor
barrier is recommended.

Maintain a 1-in. clearance from combustible materials to supply air
ductwork for a distance of 36 in. horizontally from the furnace. See
NFPA 90B or local code for further requirements.

DUCTWORK ACOUSTICAL TREATMENT

Metal duct systems that do not have a 90 degree elbow and 10 ft
of main duct to the first branch take-off may require internal
acoustical lining. As an alternative, fibrous ductwork may be used
if constructed and installed in accordance with the latest edition of
SMACNA construction standard on fibrous glass ducts. Both
acoustical lining and fibrous ductwork shall comply with NFPA
90B as tested by UL Standard 181 for Class 1 Rigid air ducts.

SUPPLY AIR CONNECTIONS

Upflow Furnaces

Connect supply-air duct to 3/4-in. flange on furnace supply-air
outlet. The supply-air duct attachment must ONLY be connected
to furnace supply-/outlet-air duct flanges or air conditioning coil
casing (when used). DO NOT cut main furnace casing to attach
supply side air duct, humidifier, or other accessories. All accesso-
ries MUST be connected external to furnace main casing.

Horizontal Furnaces

Connect supply-air duct to supply-air (outlet) opening on furnace.
(See Fig. 1.) The supply-air duct attachment must ONLY be
connected to furnace supply/outlet or air conditioning coil casing
(when used). DO NOT cut main furnace casing to attach supply
side air duct, humidifier, or other accessories. All accessories
MUST be connected external to furnace main casing.

Fig. 6—Confined Space: Air for Combustion and

Ventilation from Outdoors

A89013

1 SQ IN.

PER

4000

BTUH*

DUCTS

TO

OUTDOORS

1 SQ IN.
PER 4000
BTUH*

SUPPLY

AIR

VENT
THROUGH
ROOF

D

B

A

C

E  

1 SQ IN.
PER 4000
BTUH*

DUCT

TO

OUTDOORS

RETURN AIR

1 SQ IN.
PER 2000
BTUH*

1 SQ IN.
PER 2000
BTUH*

DUCTS

TO

OUTDOORS

12

 MAX

12

 MAX

12

 MAX

Use any of the following
combinations of openings:
A & B     C & D    D & E     F & G

NOTE:

*

Minimum dimensions of 3 in.

CONFINED

SPACE

12

MAX

12

MAX

OUTDOORS

1 SQ IN.

PER

4000

BTUH*

F

G

6

Summary of Contents for 58UXT Series

Page 1: ...Conditioning Systems NFPA 90B ANSI NFPA 90B In Canada refer to the current edition of the CAN CGA B149 1 and 2 M00 National Standard of Canada Natural Gas and Propane Installation Codes NSCNGPIC Wear safety glasses and work gloves Have a fire extinguisher available during start up and adjustment procedures and service calls Recognize safety information This is the safety alert symbol When you see ...

Page 2: ...e and unit sizing Improper installation or misapplication of the furnace can require excessive servicing or cause premature component failure To aid in installation troubleshooting and service a status code label is located on the blower compartment door This label explains how to use the LED status indicator on the furnace control which is viewed through the sight glass on the door Fig 1 Dimensio...

Page 3: ...y be 0 inches For upflow furnaces bottom clearance may be 0 inches Indicates supply or return sides when furnace is in the horizontal position Line contact only permissible between lines formed by intersections of the Top and two Sides of the furnace jacket and building joists studs or framing 18 inches front clearance required for alcove For single wall vent 6 inches For Type B 1 vent 3 inches 32...

Page 4: ...ls and many other solvents commonly used in the construction process Excessive exposure to contami nated combustion air will result in safety and performance related problems Do not install furnace in a corrosive or contaminated atmo sphere Make sure all combustion and circulating air require ments are met in addition to all local codes and ordinances This furnace must be installed so the electric...

Page 5: ...tion ventilation and dilution of flue gases using 1 of the following methods See Fig 5 and Table 2 NOTE In determining free area of an opening the blocking effect of louvers grilles and screens must be considered If free area of louver or grille design is unknown assume that wood louvers have a 20 percent free area and metal louvers or grilles have a 60 percent free area Screens when used must not...

Page 6: ...ir must also be handled by a duct s sealed to the furnace casing and terminating outside the space containing the furnace Secure ductwork with proper fasteners for type of ductwork used Seal supply and return duct connections to furnace with code approved tape or duct sealer Flexible connections should be used between ductwork and furnace to prevent transmission of vibration Ductwork passing throu...

Page 7: ...er or a factory specified high efficiency disposable filter see cabinet instructions If installing the filter in the furnace blower compartment deter mine location for the filter and relocate filter retaining wire if necessary After the return air duct has been connected to the furnace install the filter s inside the furnace blower compartment See Fig 7 for side return application and Fig 8 for bo...

Page 8: ...1 and Fig 11 INSTALL FURNACE 1 Position furnace in desired location 2 Connect gas supply pipe See Fig 11 for typical piping entry 3 Connect supply and return air ducts 4 Install 24 X 24 in sheet metal shield on platform in front of louvered control panel as shown in Fig 11 Step 6 Horizontal Crawlspace Installation The furnace can be installed horizontally with either LH or RH side up In a crawlspa...

Page 9: ...UDS OR FRAMING CLEARANCE TO COMBUSTIBLE MATERIALS Fig 12 Crawlspace Horizontal Installation A97600 NOTES ANGLE IRON OR EQUIVALENT ROD LOCATION USING DIMPLE LOCATORS SEE DIMENSIONAL DWG FOR LOCATIONS 3 8 IN ROD 1 A 1 In clearance minimum between top of furnace and combustible material 2 The entire length of furnace must be supported when furnace is used in horizontal position 3 8 IN HEX NUT WASHER ...

Page 10: ...tion of propane gas Install an accessible manual shutoff valve upstream of furnace gas controls and within 72 in of furnace A 1 8 in NPT plugged tapping is provided on the gas valve for test gage connection Installation of an additional 1 8 in NPT plugged tapping acces sible for test gage connection installed immediately upstream of gas supply connection to furnace and downstream of manual shutoff...

Page 11: ...Canada Natural and Propane Installation Codes CAN CGA B149 1 and 2 M00 in Canada for proper vent sizing and installation requirements After fully assembling the vent connector to the furnace flue collar securely fasten the vent connector to the collar with 2 field supplied corrosion resistant sheet metal screws located 180 degrees apart and midway up the collar The horizontal portion of the ventin...

Page 12: ... DISCONNECT SWITCH WHEN REQUIRED JUNCTION BOX CONTROL BOX 24 V TERMINAL BLOCK TWO WIRE HEATING ONLY FIVE WIRE 1 STAGE THERMOSTAT TERMINALS FIELD SUPPLIED FUSED DISCONNECT CONDENSING UNIT FURNACE COM R W Y R G C GND GND GND GND GND GND FIELD 24 V WIRING FIELD 115 208 230 460 V WIRING FACTORY 24 V WIRING FACTORY 115 V WIRING 208 230 OR 460 V THREE PHASE 208 230 V SINGLE PHASE WHT BLK WHT BLK W W1 W2...

Page 13: ...ed and a 2 sec flame proving period begins If the high heat pressure switch HPS fails to close on call for high stage gas heat and the low heat pressure switch LPS closes the furnace operates at low heat gas flow rate until the high heat HPS pressure switch closes d Flame proving When burner flame is proved at flame proving sensor electrode FSE the control CPU begins blower on delay period and con...

Page 14: ...en inducer motor IDM reduces pressure sufficiently the high heat pressure switch HPS will open The low heat gas valve solenoid GV remains energized as long as low heat pressure switch LPS remains closed The blower motor BLWM switches speed for low gas heat 5 sec after R W2 circuit opens 3 Cooling Mode a Single Speed Cooling Outdoor Unit See Fig 15 for thermostat connections 1 The thermostat closes...

Page 15: ...to reset thermal overload switches 4 Blower motor speed selections are for average conditions See Installation Instructions for details on optimum speed selection 5 Replace only with a 3 AMP fuse 6 Auxiliary limit switches ALS1 2 used on some horizontal and some downflow models 7 This wire must be connected to furnace sheet metal for control to prove flame 8 Factory connected when LGPS not used RE...

Page 16: ... EAC 2 are energized with 115v when the blower motor BLWM is operat ing 3 When thermostat is satisfied furnace blower motor BLWM continues operating on high cool speed for an additional 90 sec b Two Speed Heat Pump Cooling 1 The thermostat R to G circuits start the furnace blower motor BLWM on low cool speed The thermostat R to G and Y Y2 circuits start the furnace blower motor BLWM on high cool s...

Page 17: ... for correct input a Obtain yearly heat value average at installed altitude from local gas supplier b Obtain yearly specific gravity average from local gas supplier c Verify furnace model Table 9 can only be used for model 58UXT furnaces d Find installation altitude in Table 9 NOTE For Canada altitudes of 2000 to 4500 ft use U S A altitudes of 2001 to 3000 ft in Table 9 e Find closest natural gas ...

Page 18: ... to 3000 or Canada Altitudes 2000 to 4500 775 43 3 4 1 4 43 3 5 1 5 43 3 6 1 5 43 3 7 1 6 43 3 8 1 6 800 44 3 6 1 5 44 3 8 1 6 43 3 4 1 4 43 3 5 1 5 43 3 6 1 5 825 44 3 4 1 4 44 3 5 1 5 44 3 7 1 5 44 3 8 1 6 43 3 4 1 4 850 44 3 2 1 4 44 3 3 1 4 44 3 4 1 5 44 3 6 1 5 44 3 7 1 5 875 45 3 7 1 6 45 3 8 1 6 44 32 1 4 44 3 4 1 4 44 3 5 1 5 900 45 3 5 1 5 45 3 6 1 5 45 3 7 1 6 45 3 8 1 6 44 3 3 1 4 925 4...

Page 19: ...3 5 1 5 44 3 6 1 5 725 45 3 6 1 5 45 3 7 1 6 45 3 8 1 6 44 3 3 1 4 44 3 4 1 4 750 45 3 4 1 4 45 3 5 1 5 45 3 6 1 5 45 3 7 1 6 45 3 8 1 6 775 45 3 2 1 3 45 3 3 1 4 45 3 4 1 4 45 3 5 1 5 45 3 6 1 5 800 47 3 5 1 5 47 3 6 1 5 45 3 2 1 3 45 3 3 1 4 45 3 4 1 4 825 48 3 8 1 6 47 3 4 1 4 47 3 5 1 5 47 3 7 1 5 45 3 2 1 3 850 48 3 6 1 5 48 3 7 1 6 48 3 8 1 6 47 3 4 1 5 47 3 5 1 5 875 48 3 4 1 4 48 3 5 1 5 4...

Page 20: ...nifold Pressure High Low Orifice No Manifold Pressure High Low Orifice No Manifold Pressure High Low U S A Only 8001 to 9000 600 45 3 4 1 4 45 3 5 1 5 45 3 6 1 5 45 3 7 1 6 45 3 8 1 5 625 47 3 7 1 6 45 3 2 1 4 45 3 3 1 4 45 3 4 1 4 45 3 5 1 4 650 47 3 4 1 4 47 3 5 1 5 47 3 6 1 5 45 3 2 1 3 45 3 3 1 5 675 48 3 6 1 5 48 3 7 1 6 48 3 8 1 6 47 3 5 1 5 47 3 6 1 6 700 48 3 3 1 4 48 3 5 1 5 48 3 6 1 5 48...

Page 21: ...altitudes from 2000 to 4500 ft this furnace must be derated 10 percent by an authorized Gas Conver sion Station or Dealer To determine correct input rate for altitude see example above and use 0 82 as derate multi plier factor b Check that gas valve adjustment caps are in place for proper input to be clocked c Obtain yearly heat value average for local gas supply NOTE Be sure heating value of gas ...

Page 22: ...ry setting med low or med 5 speed blowers only Disconnect the electrical power before changing the speed tap or removing motor lead cap if used on 5 speed motors A failure to follow this warning can cause personal injury NOTE For units with 5 speed motors make sure the unused speed tap is either capped or placed on SPARE terminal on control board before power is restored d To change motor speed se...

Page 23: ...ailure 2 Check draft safeguard switch The purpose of this control is to permit the safe shutdown of the furnace during certain blocked vent conditions a Disconnect power to furnace and remove vent connector from furnace flue collar Be sure to allow time for vent pipe to cool down before removing b Restore power to furnace and set room thermostat above room temperature c After normal start up allow...

Page 24: ...e Training plus hands on the products in our labs can mean increased confidence that really pays dividends in faster troubleshooting fewer callbacks Course descriptions and schedules are in our catalog CALL FOR FREE CATALOG 1 800 962 9212 Packaged Service Training Classroom Service Training Copyright 2001 CARRIER Corp 7310 W Morris St Indianapolis IN 46231 58uxt5si Manufacturer reserves the right ...

Reviews: