59CU5A: Installation, Start-up, Operating and Service and Maintenance Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
12
• There is an air gap at the point where the two drain lines meet or
• All condensate piping is at least 3/4” PVC and there is a relief tee at
the top of condensate drain piping as shown , see
A200069
A200070
A200071
Fig. 10 – Example of Field Drain Attachment (Not Allowed)
A200072
A200073
A200074
NOTE:
Coil may require metal spacer or shield between furnace and
coil. See coil install requirements, see
Fig. 11 – Example of Field Drain Attachment