60
• Remove the generator wire connector.
• Remove the generator wire holder.
• Remove the generator coil bolt.
• Remove the generator wire rubber bushing from the
right crankcase.
• Remove the coil set.
Do not damage the coil when removing.
GENERATOR INSTALLATION
Reverse the removal procedure for installation.
When installing the flywheel, make sure there are no metal
pieces, such as bolts or nuts, attachinging to the inner wall of
the flywheel. After the installation is finished, start the engine
to inspect and adjust the ignition timing.
REGULATE RECTIFIER
MAIN WIRING – SUB ELECTRIC CIRCUIT CONDITION INSPECTION
Do the voltage regulate rectifier inspection procedure in two
steps: First inspect the main wiring – sub electric condition,
and then inspect the voltage regulator. Second, inspect only
when engine is cold.
• Remove the 4-core connector of the regulate rectifier.
• Measure the conducting status between the main wiring terminals according to the previous wir-
ing diagram.
Summary of Contents for Talon 150 DLX Series
Page 1: ...Talon 150 GX FX DLX Series Service Manual...
Page 4: ......
Page 8: ...4 LOCATION OF PARTS...
Page 76: ...72...