background image

Page 1 of 5

52 Voyager Setup 

   Part Number 9992007  1/07

52 Voyager Setup

 

1.  Install props and rudders; install starboard side 

steering linkage first. Make sure rudder cotter keys 

are installed. Install drain plug.

 

2.  Remove fiberglass shipping top from deck. Also, 

remove plastic off bridge. Remove tape and clean 

areas where bridge will set. Check for voids along 

the top of the windows. 

 

3.  Apply sealant (white Sikaflex) supplied in MAC 

kit, #8105901, around deck where bridge will set. 

Also, check for voids in foam above patio door. 

 

 

NOTE:

 

Refer to attached pictures for sealant and 

sealant tape placement. Apply sealant just prior to 

setting bridge. Also, apply black silicone on top of the 

poly strips located on the deck top.

 

4.  The lifting points for the bridge are the two lifting 

eyes each on the front and aft of the bridge. Set 

bridge in position over boat with bridge up about 

16". Long white plastic divider board should be 

installed on portside of deck where bridge seats, sit 

prior to setting bridge down. Lay starboard board 

down on cabin top, where it will be installed later.

 

 

NOTE:

 

If this is not done, you will not be able to 

put the divider board under the seats. See pictures.

 

5.  Lay all wire/hoses on cabin top. Hold to outboard 

so nothing gets pinched. 

See pictures.

 

  a. Connect davit wires and light wires at port stern 

corner of bridge. You may have to wire davit thru 

seat after bridge is set.

Area above patio door

Lay wires on cabin top as shown. 

White dividers installed or laying down.

Re-set air conditioning unit as shown

Picking with crane. Use same pick points when picking 

with travel lift or forklift.

Reviews: