Page 1 of 5
52 Voyager Setup
Part Number 9992007 1/07
52 Voyager Setup
1. Install props and rudders; install starboard side
steering linkage first. Make sure rudder cotter keys
are installed. Install drain plug.
2. Remove fiberglass shipping top from deck. Also,
remove plastic off bridge. Remove tape and clean
areas where bridge will set. Check for voids along
the top of the windows.
3. Apply sealant (white Sikaflex) supplied in MAC
kit, #8105901, around deck where bridge will set.
Also, check for voids in foam above patio door.
NOTE:
Refer to attached pictures for sealant and
sealant tape placement. Apply sealant just prior to
setting bridge. Also, apply black silicone on top of the
poly strips located on the deck top.
4. The lifting points for the bridge are the two lifting
eyes each on the front and aft of the bridge. Set
bridge in position over boat with bridge up about
16". Long white plastic divider board should be
installed on portside of deck where bridge seats, sit
prior to setting bridge down. Lay starboard board
down on cabin top, where it will be installed later.
NOTE:
If this is not done, you will not be able to
put the divider board under the seats. See pictures.
5. Lay all wire/hoses on cabin top. Hold to outboard
so nothing gets pinched.
See pictures.
a. Connect davit wires and light wires at port stern
corner of bridge. You may have to wire davit thru
seat after bridge is set.
Area above patio door
Lay wires on cabin top as shown.
White dividers installed or laying down.
Re-set air conditioning unit as shown
Picking with crane. Use same pick points when picking
with travel lift or forklift.