CARVIN
®
SILVER SERIES ABOVE-GROUND POOL | USER MANUAL
10
FASTENING THE LINER ON TO THE POOL WALL
FOR ASSEMBLY WITH A U/J TYPE POOL LINER
STEP 1
The top of the liner has a welded vinyl flange to hang the liner. It is called an J-hook
liner. Open it with your fingers and hang on the top of the wall.
Pool wall
Top rail
Top rail
(second)
Liner
FIRST RAIL INSTALLATION
• Align the ‘‘Check Icon’’ with the center of the wall bolt.
• Press down the rail from the right end to the left.
You might need a rubber mallet to place the upper rails in position and properly lock
the liner in place.
STEP 2
Hang the liner on the wall all around the pool. The liner should be free of any wrin-
kles or creases on the vertical portion on the walls. If this is the case, adjust the liner
by turning the bottom of the liner, or by adjusting the overlap on the wall contour.
STEP 3
As you install and hang the overlap liner, assemble the top rails to solidify the pool.
Position these top rails to be aligned with the bottom rails because the uprights will
have to be installed in top and bottom plates which are the junction between rails.
STRUCTURE ASSEMBLY
UPRIGHT INSTALLATION
Before starting the installation of the uprights, check if the bottom plates are
centered correctly into the rails of each plate. Adjust if necessary.
STEP 1
Insert uprights into each bottom plates. Push the upright down until you hear a click.
STEP 2
Holes are located on each side of each bottom plate to install screws. The installation
of these screws is mandatory to make the assembly even more solid against ground
movements due to freeze/thaw.
Do not cut the excess liner on the outside of the wall of the pool. If disassembly
or reassembly is necessary, a liner that has been cut will be much more
difficult to position. If the excess liner is too long, simply fold it and fasten it
with tape.
SECOND RAIL INSTALLATION
• Rail installation has a ‘‘Clock Wise’’ direction.
• Allign the second rail ‘‘Check Icon’’ with the center of the wall bolt or in the
ajustment area.
Press down the rail from the right end to the left.
X
X
Pool wall
Top rail
Top rail
Top rail
(second)
Liner
Pool wall
Top rail
(second)
Liner
CLICK!
Do not install these screws for now. Wait until the top seats are positioned in
place to install the screws.