5. STRUCTURE ASSEMBLY
(continued)
5.3 TOP LEDGE INSTALLATION
5.3.1 Position all top ledges around the pool structure.
5.3.2 Center the top ledges to the top plates and
uprights.
Screwing the top ledges will solidify
the verticality of the uprights.
Make sure the uprights are straight
before screwing top ledges.
Use the corrugation (fold lines) of the steel wall to
guide you on straightness of the uprights.
5.3.3 Before screwing top ledges, pull them towards the
exterior of the pool so that the corners on the interior of
the pool are pressed and flush against top plates. Screw
top ledges with 2 screws on each side. Use the outermost
holes to screw on the top ledges.
Many holes are on the top plates for assembly, use the one
that seems best located for your installation.
5.4 TOP LEDGE COVER INSTALLATION
5.4.1 Pre-assemble front (interior) and back (exterior) top
ledge covers until you hear the first click.
5.4.2 Insert the rear part of the top ledge covers (hook)
under top ledge and turn the top ledge cover assembly
downwards.
53.
Interior
Exterior