22
HOW TO INSTALL DB-II Series
MEMO
1. Open the box with care because indicator is connected to the scale with
load cell wire.
2. Turn the post knob so as to fix indicator.
3. Pull down the wire out of post pipe and insert the post pipe to the post
bracket. (Refer to fig. 1)
4. Fasten the post pipe with two bolts. (Refer to fig. 1)
A long bolt should be connected to the upper side.
5. Insert the wire to the post pipe. (Refer to fig. 2, 3)
6. If the scale is not properly level, please adjust 4 leg(adjusting bolt) at the
bottom of the scale so as to center the bubble of the leveling gauge.
Note : Place the scale on a flat and stable surface.
Inside the indicated circle.
INDICATOR
FIG.1
LOAD CELL WIRE
POST BRACKET
LEVELING GAUGE
PLATFORM
ADJUST
POST KNOB
POST PIPE
BOLT
FIG.2
FIG.3
POST PIPE
POST BRACKET
WIRE
23