INSTALLATION
I
NSTALLATION
P
ROCEDURE
C
HECKLIST
For installing the oven in a new workspace location.
Pre-Installation
Check that the required ambient conditions for the oven are met, page 18.
Verify the spacing and clearance requirements are met, page 18.
•
Unit dimensions may be found on page 7.
Check that a suitable electrical outlet and power supply is present, page 19.
Install the oven in a suitable workspace location
Review the lifting and handling instructions, page 20.
Install the leveling feet, page 21.
Install the oven in its workspace location, page 21.
Set up the oven for use
Clean the oven shelving. Clean the chamber if needed, page 21.
Install the shelving, page 22.
Verify the stopper is installed in the access port on the outside of the oven, page 22.
Summary of Contents for CDO-5-2
Page 1: ...Installation Operation Manual CDO 5 2 Drying Decarboxylation Oven 220 240 Voltage...
Page 6: ...6 P a g e cascadesciences com Tel 503 847 9047 CERTIFICATIONS...
Page 10: ...10 P a g e cascadesciences com Tel 503 847 9047 SPECIFICATIONS...
Page 12: ...12 P a g e cascadesciences com Tel 503 847 9047 INTRODUCTION...
Page 44: ......