INSTALLATION
L
EVELING
Install the 4 leveling feet with the 4 corner holes on the bottom of the oven.
The oven must be level and stable for safe operation.
Note:
To prevent damage when moving the unit, turn all 4 leveling feet so that the leg of each foot
sits inside the unit.
I
NSTALL THE
O
VEN
Install the unit in a workspace location that meets the criteria discussed in the previous entries of the
Installation section.
•
Verify that the oven stands level and does not rock. Adjust the leveling feet as needed.
I
NSTALLATION
C
LEANING
The manufacturer recommends cleaning the shelving and oven chamber prior to installation of the
shelving in the chamber. The unit was cleaned at the factory but may have been exposed to contaminants
during shipping.
•
The unit was cleaned at the factory but may have been exposed to contaminants during
shipping.
•
Remove all wrappings and coverings from shelving prior to cleaning and installation.
•
Do not clean with deionized water.
•
topic in the User Maintenance section (page 37) for more
information on how to clean and disinfect without damaging the unit.
Summary of Contents for CDO-5-2
Page 1: ...Installation Operation Manual CDO 5 2 Drying Decarboxylation Oven 220 240 Voltage...
Page 6: ...6 P a g e cascadesciences com Tel 503 847 9047 CERTIFICATIONS...
Page 10: ...10 P a g e cascadesciences com Tel 503 847 9047 SPECIFICATIONS...
Page 12: ...12 P a g e cascadesciences com Tel 503 847 9047 INTRODUCTION...
Page 44: ......