60 |
P a g e
cascadesciences.com
|
Tel. 503 847-9047
INSTALLATION
Optional Side Valve Vacuum Supply Connection
•
Cap the Vacuum port on the back of the oven when using the side valve configuration. This is
required to help safeguard against the intrusions of Zone 2 atmosphere into the oven
chamber.
3. Connect the Pump to its Power Supply
•
Power Cords
: A vacuum pump with a power cord must plug into a power outlet located
safely outside of the hazardous location.
•
Hardwire
: A pump with a hardwire power feed can be connected to a permanent connect
power source outside of or inside the hazardous zone.
o
Any connection made in the hazardous zone must meet all applicable requirements
for Zone 2 or for (UL) Class 1 Zone 2 or Class 1 Division 2 hazardous (classified)
locations.
o
The connection must be made by a qualified electrical service technician who is
competent to work in the hazardous location zone.
4. Connect the Vacuum Pump Exhaust
•
The pump exhaust is a Zone 1 hazardous atmosphere
. Explosive concentrations of
hazardous gases will be present in it during routine operations.
•
Connect the pump exhaust port to the suitable venting or HVAC system to safely remove
outgassed products and other exhausts from the workspace area.
•
The HVAC or other climate control system must the requirements described in the
Installation chapter Vacuum Supply Required
topic on page 33.
Pump
Optional: Connect your vacuum supply to this KF-25
port
Vacuum Port Cap
Summary of Contents for CVO-5-EX Series
Page 1: ...Flammable Solvent Ovens Installation Operation Manual CVO 5 EX Oven Series...
Page 6: ...6 P a g e cascadesciences com Tel 503 847 9047 Special Conditions Of Use 131...
Page 7: ...7 P a g e cascadesciences com Tel 503 847 9047 TABLE OF CONTENTS...
Page 11: ...11 P a g e cascadesciences com Tel 503 847 9047 SAFETY CERTS AND STATEMENTS...
Page 17: ...17 P a g e cascadesciences com Tel 503 847 9047 SPECIFICATIONS...
Page 22: ...22 P a g e cascadesciences com Tel 503 847 9047...
Page 24: ...24 P a g e cascadesciences com Tel 503 847 9047 These groups include propane and n butane...
Page 29: ...29 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 37: ...37 P a g e cascadesciences com Tel 503 847 9047 INTRODUCTION...
Page 39: ...39 P a g e cascadesciences com Tel 503 847 9047...
Page 44: ...44 P a g e cascadesciences com Tel 503 847 9047 RECEIVING...
Page 51: ...51 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 54: ...54 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 61: ...61 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 65: ...65 P a g e cascadesciences com Tel 503 847 9047 INSTALLATION...
Page 67: ...67 P a g e cascadesciences com Tel 503 847 9047 SYMBOLS...
Page 69: ...69 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 72: ...72 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 95: ...95 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 104: ...104 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 116: ...116 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 123: ...123 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 125: ...125 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 127: ...127 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 128: ...128 P a g e cascadesciences com Tel 503 847 9047 MAINTENANCE...
Page 130: ...130 P a g e cascadesciences com Tel 503 847 9047 REPLACEMENT PARTS...
Page 132: ......