OPERATION
Note:
All procedures in the Installation chapter must be completed prior to starting the operational
setup on this page.
P
UT THE
O
VEN INTO
O
PERATION
After the oven is installed in a new workspace location, complete the steps and procedures listed in this
entry. These test the vacuum integrity of the oven and connected vacuum system and set the over-
temperature heating cutoff system prior to using the oven for a baking process or application. The
process may require 1 to 3 hours depending on the temperature the oven will be heated to.
No
hazardous substances or potentially explosive concentrations of gases or vapors are allowed
in the oven or in the workspace area around the oven during this operational set-up with its
vacuum system verification
.
Preparation
Determine the highest temperature the oven will heat to during the first baking procedure.
Perform the
Pre-Operation Safety Verifications
procedure on page 91.
Verify no hazardous substances are present in the workspace location.
Verify your process SOPs designate either the Vent or Backfill valve control on the front panel to
backfill the oven chamber when restoring room pressure to the oven chamber.
First Activation
Perform the
Supply Gas to the Purge and Pressurize System
procedure found on page 91.
Provide power to the oven.
Power Cord Ovens:
Plug the oven into its power outlet. Reminder: This outlet must
be located outside the hazardous classified location.
Hardwire Ovens:
Energize the power supply feed to the oven.
•
The Purge Indicator light will illuminate in blinking green if you have started the purge
and pressurize gas flow.
•
Note
: The Purge Indicator light will begin blinking red if no purge gas is flowing
through the enclosures.
Continued next page
Summary of Contents for CVO-5-EX Series
Page 1: ...Flammable Solvent Ovens Installation Operation Manual CVO 5 EX Oven Series...
Page 6: ...6 P a g e cascadesciences com Tel 503 847 9047 Special Conditions Of Use 131...
Page 7: ...7 P a g e cascadesciences com Tel 503 847 9047 TABLE OF CONTENTS...
Page 11: ...11 P a g e cascadesciences com Tel 503 847 9047 SAFETY CERTS AND STATEMENTS...
Page 17: ...17 P a g e cascadesciences com Tel 503 847 9047 SPECIFICATIONS...
Page 22: ...22 P a g e cascadesciences com Tel 503 847 9047...
Page 24: ...24 P a g e cascadesciences com Tel 503 847 9047 These groups include propane and n butane...
Page 29: ...29 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 37: ...37 P a g e cascadesciences com Tel 503 847 9047 INTRODUCTION...
Page 39: ...39 P a g e cascadesciences com Tel 503 847 9047...
Page 44: ...44 P a g e cascadesciences com Tel 503 847 9047 RECEIVING...
Page 51: ...51 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 54: ...54 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 61: ...61 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 65: ...65 P a g e cascadesciences com Tel 503 847 9047 INSTALLATION...
Page 67: ...67 P a g e cascadesciences com Tel 503 847 9047 SYMBOLS...
Page 69: ...69 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 72: ...72 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 95: ...95 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 104: ...104 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 116: ...116 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 123: ...123 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 125: ...125 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 127: ...127 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 128: ...128 P a g e cascadesciences com Tel 503 847 9047 MAINTENANCE...
Page 130: ...130 P a g e cascadesciences com Tel 503 847 9047 REPLACEMENT PARTS...
Page 132: ......