26 |
P a g e
INSTALLATION
V
ERIFY THE
O
VEN
C
HAMBER IS
E
MPTY
Prior to placing the oven into operation, verify the oven chamber is clean and all shipping dunnage and
any shelf wrappings have been removed.
Failure to do so may result in damage to the oven chamber interior or vacuum pump.
H
ARDWIRE THE
O
VEN TO
I
TS
P
OWER
S
UPPLY
The oven may now be connected to a power supply that meets the requirements on page 19.
Power Braid:
Each oven comes provided with an integral 6-inch (150-mm) wire braid consisting of:
•
Two 10-gauge hot wires – black, red
•
One 10-gauge earth ground – green-yellow
The oven must be earth grounded using the protective conductor terminal
(green with yellow
stripe wire). Do not remove the protective conductor (earth connection). Removing the protective
conductor will negate the oven’s protections against potentially dangerous electric shocks and
create a potential fire hazard.
Remove the cover to expose the power
wire braid. Use a Phillips-head screwdriver.
Summary of Contents for CTVR522-H
Page 1: ...Vacuum Control Oven SVO 5 VC Installation and Operation Manual ...
Page 6: ...6 P a g e TABLE OF CONTENTS ...
Page 16: ...16 P a g e RECEIVING ...
Page 28: ...28 P a g e SYMBOLS ...
Page 34: ...34 P a g e CONTROLS ...