4 - OPERATING INSTRUCTIONS
4 - OPERATING INSTRUCTIONS
###_4_###
COMMISSIONING THE UNIT
Run in period of a new machine
During the first 20 hours of operation (new machine or after an engine rebuild), make sure you:
• Operate the machine with normal loads for the first 8 hours.
• Do not work the engine hard at stall speeds (wheels slowly turning or stopped and the engine running at full throttle).
• Keep the engine at normal operating temperature.
• Do not run the engine at idle speeds for long periods of time.
• Operating the machine at low idle for prolonged periods, increases the frequency of the regeneration process and
shortens the life of the diesel particulate filter.
Engine speed
It is recommended that you run the engine at full throttle when operating conditions permit and when safe.
NOTICE:
Do not run the engine at idle speed for long periods. This can cause a low operating temperature. Low
operating temperature can cause acids and deposits in the engine oil.
NOTICE:
Operating the machine at low idle for prolonged periods, increases the frequency of the regeneration process
and shortens the life of the diesel particulate filter.
4-1
Summary of Contents for 570NXT
Page 8: ......
Page 24: ...1 GENERAL INFORMATION 1 16 ...
Page 88: ...3 CONTROLS INSTRUMENTS 3 28 ...
Page 142: ...6 WORKING OPERATIONS 6 34 ...
Page 193: ...7 MAINTENANCE Cylinder closed end Two total one on each side RCPH10TLB258AAF 3 7 51 ...
Page 252: ...7 MAINTENANCE 7 110 ...
Page 257: ...8 SPECIFICATIONS Machine overall dimensions 8 5 ...
Page 259: ...8 SPECIFICATIONS RAIL12UTL0182GA 1 8 7 ...
Page 260: ...8 SPECIFICATIONS 8 8 ...
Page 262: ...8 SPECIFICATIONS RAIL12UTL0182GA 2 8 10 ...
Page 272: ...9 ACCESSORIES 9 4 ...
Page 279: ......