4 - OPERATING INSTRUCTIONS
Booster battery procedure with optional jump post
1. Sit in the operator's seat and have the other person
make the connections. Make sure the booster batter-
ies are
12 V
.
2. If using another machine for power, make sure the two
machines do not touch.
3. Connect the jumper cables to the booster battery.
4. Remove the red rubber boot from the terminal post.
5. Connect the positive
(+)
jumper cable to the positive
(+)
terminal as shown.
6. Connect the negative
(-)
jumper cable to the frame, as
far away as possible from the positive
(+)
cable.
7. Start the engine and have the other person disconnect
the negative
(-)
jumper cable first and the positive
(+)
jumper cable last.
8. Disconnect the jumper cables from the booster battery.
RAPH12FRK1184BA
2
4-8
Summary of Contents for 570NXT
Page 8: ......
Page 24: ...1 GENERAL INFORMATION 1 16 ...
Page 88: ...3 CONTROLS INSTRUMENTS 3 28 ...
Page 142: ...6 WORKING OPERATIONS 6 34 ...
Page 193: ...7 MAINTENANCE Cylinder closed end Two total one on each side RCPH10TLB258AAF 3 7 51 ...
Page 252: ...7 MAINTENANCE 7 110 ...
Page 257: ...8 SPECIFICATIONS Machine overall dimensions 8 5 ...
Page 259: ...8 SPECIFICATIONS RAIL12UTL0182GA 1 8 7 ...
Page 260: ...8 SPECIFICATIONS 8 8 ...
Page 262: ...8 SPECIFICATIONS RAIL12UTL0182GA 2 8 10 ...
Page 272: ...9 ACCESSORIES 9 4 ...
Page 279: ......