7 - MAINTENANCE
Rear axle fluid level
Check the oil level of the rear axle after the first 20 hours of operation with a new machine or after a component
rebuild. Then check the oil level every 250 hours of operation.
1.
Place the machine on a firm level surface.
2.
Shut down the engine.
3.
Slowly remove the oil check/fill plug. Oil should be
even with the bottom of the plug orifice.
4.
Add oil as needed.
5.
Install the plug.
RAPH12FRK0276AA
1
7-44
Summary of Contents for 570NXT
Page 8: ......
Page 24: ...1 GENERAL INFORMATION 1 16 ...
Page 88: ...3 CONTROLS INSTRUMENTS 3 28 ...
Page 142: ...6 WORKING OPERATIONS 6 34 ...
Page 193: ...7 MAINTENANCE Cylinder closed end Two total one on each side RCPH10TLB258AAF 3 7 51 ...
Page 252: ...7 MAINTENANCE 7 110 ...
Page 257: ...8 SPECIFICATIONS Machine overall dimensions 8 5 ...
Page 259: ...8 SPECIFICATIONS RAIL12UTL0182GA 1 8 7 ...
Page 260: ...8 SPECIFICATIONS 8 8 ...
Page 262: ...8 SPECIFICATIONS RAIL12UTL0182GA 2 8 10 ...
Page 272: ...9 ACCESSORIES 9 4 ...
Page 279: ......