2000-16
Bur 5-5410
Issued 2-07
Printed in U.S.A.
STEP 84
BD07B211
Install the mounting bolt for the deaeration tank to
lower radiator hose.
STEP 85
BD07B210
Connect the heater hose and lower radiator hose.
STEP 86
BD07B232
Install bolt securing alternator wiring to the engine.
STEP 87
BD07B217
Connect the engine block vent hose.
STEP 88
BD07B072
Connect electrical connectors to the alternator, make
sure wires do not rub the engine.
STEP 89
Attach lifting equipment to fire wall and muffler and
carefully raise over the loader. Lower fire wall and
muffler onto machine.