ELECTRIC CIRCUIT
5 - 36
CASE TRAINING CENTER
AUGUST 2000
3) Timing diagram
4) Automatic swing brake control
Automatic brake control operates when the swing brake red LED is off.
When the swing and an attachment function are operated simultaneously, the mechanical swing brake is
automatically disengaged. When the operation stops, the mechanical swing brake is automatically activated by
the main electronic control box.
The swing brake is automatically deactivated when:
- The swing pilot pressure switch (5) is activated.
- When the pressure at the pressure detectors P1 (8) or P2 (9) is higher than 150 bar (15 MPa).
The swing brake is automatically activated when:
- The pilot pressure switch (6) is deactivated for more than 5 seconds.
- The starter switch (3) is in the = OFF position.
When the pressure supplied by the pump (P1 or P2) exceeds 150 bar (15 MPa) during one single travel, the
mechanical swing brake is deactivated for 5 seconds, then reactivated.
ON
OFF
24 V
0 V
ON
OFF
5 V (OFF)
0 V (ON)
5 V
0 V
ON
OFF
OFF
ON
ON
OFF
ON
ON
Supply
Brake
LED
OUT
(N1)
Starter motor
switch
Swing brake switch
Swing pilot
pressure switch
Summary of Contents for CX130
Page 1: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000...
Page 2: ......
Page 3: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 1 GENERALE INTRODUCTION...
Page 4: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 24: ......
Page 25: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 2 COMPONENTS LAYOUT...
Page 26: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 33: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 3 COMPONENTS...
Page 34: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 37: ...COMPONENTS CX130 3 3 CASE TRAINING CENTER AUGUST 2000 Hand remote control...
Page 39: ...COMPONENTS CX130 3 5 CASE TRAINING CENTER AUGUST 2000 Foot control...
Page 41: ...COMPONENTS CX130 3 7 CASE TRAINING CENTER AUGUST 2000 Auxiliary foot control...
Page 53: ...COMPONENTS CX130 3 19 CASE TRAINING CENTER AUGUST 2000 Pump...
Page 54: ...3 20 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Page 55: ...COMPONENTS CX130 3 21 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Page 56: ...3 22 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump control block follow...
Page 57: ...COMPONENTS CX130 3 23 CASE TRAINING CENTER AUGUST 2000 Pump control block...
Page 58: ...3 24 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Page 59: ...COMPONENTS CX130 3 25 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Page 60: ...3 26 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Page 61: ...COMPONENTS CX130 3 27 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Page 62: ...3 28 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Page 63: ...COMPONENTS CX130 3 29 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Page 68: ...3 34 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Boom savety valve H B C V...
Page 69: ...COMPONENTS CX130 3 35 CASE TRAINING CENTER AUGUST 2000 Dipper arm savety valve H B C V...
Page 71: ...COMPONENTS CX130 3 37 CASE TRAINING CENTER AUGUST 2000...
Page 73: ...COMPONENTS CX130 3 39 CASE TRAINING CENTER AUGUST 2000...
Page 74: ...3 40 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Page 75: ...COMPONENTS CX130 3 41 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Page 76: ...3 42 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Page 77: ...COMPONENTS CX130 3 43 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Page 78: ...3 44 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Page 79: ...COMPONENTS CX130 3 45 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Page 80: ...3 46 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Page 81: ...COMPONENTS CX130 3 47 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Page 82: ...3 48 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Page 83: ...COMPONENTS CX130 3 49 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Page 84: ...3 50 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Flow restrictor...
Page 85: ...COMPONENTS CX130 3 51 CASE TRAINING CENTER AUGUST 2000 Boom cylinder...
Page 88: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 103: ...DIAGNOSTIC SELECTION 4 15 CASE TRAINING CENTER AUGUST 2000...
Page 141: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 5 ELECTRICAL...
Page 142: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 143: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 190: ......
Page 191: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 6 HYDRAULIC CIRCUIT...
Page 192: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 193: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 215: ...HYDRAULIC CIRCUIT 6 22 CASE TRAINING CENTER AUGUST 2000...
Page 219: ...HYDRAULIC CIRCUIT 6 26 CASE TRAINING CENTER AUGUST 2000 Clamshell option Multipurpose option...
Page 223: ...HYDRAULIC CIRCUIT 6 30 CASE TRAINING CENTER AUGUST 2000 PUMP CX 130 Pump engine stopped...
Page 234: ......
Page 235: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 7 SETTINGS...
Page 236: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 260: ......