3 - 36
COMPONENTS CX130
CASE TRAINING CENTER
AUGUST 2000
Boom savety valve (H.B.C.V)
Purpose:
Two safety valves are fitted on the piston end of the boom cylinders. They avoid any uncontrollable boom down
movement when a plumbing failure may occur on the piping between the piston end cylinder and the control
valve.
Description:
3A
Piloted check valve
3B
Check valve
3C
Spool
46G
Relief valve including an anti-cavitation valve
The two piston ends are connected together by a hose to balance the pressure of the two cylinders. The
connecting ports of the balance hose get a restrictor.
A pressure sensor is fitted on P2 orifice to inform the controller of the piston end pressure.
Current operation
Neutral
The cylinder piston end is closed by 3B and 3A check valves. The check valve 3A cannot be pushed back
because its spring side is not connected with the tank by 3C spool.
Boom up
The remote control pressure (4b22) pushes the control valve spool. The oil flows out of the control valve (4B2
port), enters the safety valve (P1 port), pushes the (3B) check valve and goes out through the P2 directly
connected with the cylinder rod end. The oil of the rod end goes to the return through the (4A2) port of the control
valve.
Boom down
The pilot pressure 4a2 pushes the control valve spool and the safety valve spool (3C).
The oil flow supplies the cylinder rod end.
The spring side of the piloted check valve 3A is connected to the tank T1 by the cross drilled and centred drilled
holes of the spool 3C. It's pushed back and the oil from the cylinder rod end goes to the tank through the groove
of the spool 3C and the port 3B of the control valve.
Safety operation
If a pipe is broken between the piston end and the control valve the operator can operate the boom down. The
movement will be controlled by the metering notches of the spool 3C groove.
Leak specification
P2 to P1+ T1 < 4cc / mn at 9,81Mpa with oil temperature at 50°C
Summary of Contents for CX130
Page 1: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000...
Page 2: ......
Page 3: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 1 GENERALE INTRODUCTION...
Page 4: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 24: ......
Page 25: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 2 COMPONENTS LAYOUT...
Page 26: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 33: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 3 COMPONENTS...
Page 34: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 37: ...COMPONENTS CX130 3 3 CASE TRAINING CENTER AUGUST 2000 Hand remote control...
Page 39: ...COMPONENTS CX130 3 5 CASE TRAINING CENTER AUGUST 2000 Foot control...
Page 41: ...COMPONENTS CX130 3 7 CASE TRAINING CENTER AUGUST 2000 Auxiliary foot control...
Page 53: ...COMPONENTS CX130 3 19 CASE TRAINING CENTER AUGUST 2000 Pump...
Page 54: ...3 20 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Page 55: ...COMPONENTS CX130 3 21 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Page 56: ...3 22 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump control block follow...
Page 57: ...COMPONENTS CX130 3 23 CASE TRAINING CENTER AUGUST 2000 Pump control block...
Page 58: ...3 24 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Page 59: ...COMPONENTS CX130 3 25 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Page 60: ...3 26 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Page 61: ...COMPONENTS CX130 3 27 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Page 62: ...3 28 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Page 63: ...COMPONENTS CX130 3 29 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Page 68: ...3 34 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Boom savety valve H B C V...
Page 69: ...COMPONENTS CX130 3 35 CASE TRAINING CENTER AUGUST 2000 Dipper arm savety valve H B C V...
Page 71: ...COMPONENTS CX130 3 37 CASE TRAINING CENTER AUGUST 2000...
Page 73: ...COMPONENTS CX130 3 39 CASE TRAINING CENTER AUGUST 2000...
Page 74: ...3 40 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Page 75: ...COMPONENTS CX130 3 41 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Page 76: ...3 42 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Page 77: ...COMPONENTS CX130 3 43 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Page 78: ...3 44 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Page 79: ...COMPONENTS CX130 3 45 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Page 80: ...3 46 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Page 81: ...COMPONENTS CX130 3 47 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Page 82: ...3 48 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Page 83: ...COMPONENTS CX130 3 49 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Page 84: ...3 50 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Flow restrictor...
Page 85: ...COMPONENTS CX130 3 51 CASE TRAINING CENTER AUGUST 2000 Boom cylinder...
Page 88: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 103: ...DIAGNOSTIC SELECTION 4 15 CASE TRAINING CENTER AUGUST 2000...
Page 141: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 5 ELECTRICAL...
Page 142: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 143: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 190: ......
Page 191: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 6 HYDRAULIC CIRCUIT...
Page 192: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 193: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 215: ...HYDRAULIC CIRCUIT 6 22 CASE TRAINING CENTER AUGUST 2000...
Page 219: ...HYDRAULIC CIRCUIT 6 26 CASE TRAINING CENTER AUGUST 2000 Clamshell option Multipurpose option...
Page 223: ...HYDRAULIC CIRCUIT 6 30 CASE TRAINING CENTER AUGUST 2000 PUMP CX 130 Pump engine stopped...
Page 234: ......
Page 235: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 7 SETTINGS...
Page 236: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 260: ......