4 - OPERATING INSTRUCTIONS
PARKING THE UNIT
Parking the machine
1. Position the machine on flat, level ground, away from
soft ground, excavations or poorly shored cavities.
2. Place the upperstructure frame in line with the under-
carriage, retract the attachment, dig the bucket into the
ground and lower the dozer blade (if equipped).
3. Turn the engine throttle button to low idle position and
let the engine run for approximately five minutes.
4. If necessary, activate the anti-theft protection. (Refer
to page
4-4
A965DECD
1
5. Stop the engine, remove the ignition key.
3F901DF6
2
6. Raise the function cancellation lever.
80856A8C
3
4-46
Summary of Contents for CX145C SR
Page 6: ......
Page 18: ...1 GENERAL INFORMATION 1 12 ...
Page 29: ...2 SAFETY INFORMATION E5054225_TU 4 2 11 ...
Page 132: ...3 CONTROLS INSTRUMENTS 3 82 ...
Page 160: ...4 OPERATING INSTRUCTIONS 4 Operate the arm control to unhook the tool KKZVLU 024A 14 4 28 ...
Page 180: ...4 OPERATING INSTRUCTIONS 4 48 ...
Page 206: ...6 MAINTENANCE Offset boom pin 10 07C803C9 17 6 16 ...
Page 207: ...6 MAINTENANCE Arm backhoe bucket 375EFD72 18 AB1F527A 19 6 17 ...
Page 298: ...8 SPECIFICATIONS Offset maximum left EACB5F36 6 See next page for the value 8 14 ...
Page 300: ...8 SPECIFICATIONS 8 16 ...