5 - TRANSPORT OPERATIONS
6. To secure the lower frame, install chains to the installa-
tion holes for transporting the lower. Cross and tightly
pull the chains to attach the other ends of chains to
the trailer. Also, secure the front and rear of lower
with chains.
2_0239
3
7. For machines with blade, install chains to the installa-
tion holes at the top ends of blade, cross and tightly
pill the chains to attach the other ends of chains to the
trailer.
2_0237
4
A.
Wire rope
B.
Block
C.
Stop block
D.
Chain
E.
Rubber mat
8. Verify that everything is blocked and tied down before
transporting the machine.
NOTICE:
Movement of the machine during transportation
is dangerous. Secure the machine firmly with wire rope
or the like so that it won’t move from vibration.
5-7
Summary of Contents for CX145C SR
Page 6: ......
Page 18: ...1 GENERAL INFORMATION 1 12 ...
Page 29: ...2 SAFETY INFORMATION E5054225_TU 4 2 11 ...
Page 132: ...3 CONTROLS INSTRUMENTS 3 82 ...
Page 160: ...4 OPERATING INSTRUCTIONS 4 Operate the arm control to unhook the tool KKZVLU 024A 14 4 28 ...
Page 180: ...4 OPERATING INSTRUCTIONS 4 48 ...
Page 206: ...6 MAINTENANCE Offset boom pin 10 07C803C9 17 6 16 ...
Page 207: ...6 MAINTENANCE Arm backhoe bucket 375EFD72 18 AB1F527A 19 6 17 ...
Page 298: ...8 SPECIFICATIONS Offset maximum left EACB5F36 6 See next page for the value 8 14 ...
Page 300: ...8 SPECIFICATIONS 8 16 ...