6 - MAINTENANCE
Systemgard lubrication analysis program
Ask your CASE CONSTRUCTION dealer about our lubricant analysis program, Systemgard. Through this service,
your lubricants are tested in an independent laboratory. You simply remove a sample of lubricant from your machine
and send the sample to the independent Systemgard laboratory. After the sample is processed, the laboratory will
report back to you and guide you with maintenance requirements. Systemgard can help support your equipment up
time and provide you with a service that can pay back dividends when you trade for another piece of equipment.
The normal engine oil change interval is every 500 hours of operation. Operating conditions, quality of the engine oil
and sulphur content of the fuel can change this interval. It is recommended that you use the Systemgard Lubricant
Analysis program. Consult your CASE CONSTRUCTION Dealer.
Hourmeter
The hourmeter enables service operations to be sched-
uled. Its hourly indications are the same as those of a
clock when the engine is running.
Servicing intervals are carefully calculated to guarantee
safe and efficient machine operation.
Be sure to carry out all the servicing operations properly
as defined in this manual.
G2Z2N3-004Z
1
Daily inspections
Every day, before starting work, it is necessary to inspect the machine and service certain of its components.
General remarks
• Check signs of leaking oil or water.
• Check that all screws and nuts are correctly tightened.
• Wipe off any dust (engine, operator's compartment etc.).
• Check for any signs of damage.
Engine
• Check the oil level and change the oil if necessary.
• Check the coolant level.
• Check the radiator for signs of clogging or deterioration.
• Check the radiator fan belt tension.
• Check the air filter is clean and not restricted.
• Check the components for signs of leaking oil or water.
• Check the condition of all lines.
6-2
Summary of Contents for CX145C SR
Page 6: ......
Page 18: ...1 GENERAL INFORMATION 1 12 ...
Page 29: ...2 SAFETY INFORMATION E5054225_TU 4 2 11 ...
Page 132: ...3 CONTROLS INSTRUMENTS 3 82 ...
Page 160: ...4 OPERATING INSTRUCTIONS 4 Operate the arm control to unhook the tool KKZVLU 024A 14 4 28 ...
Page 180: ...4 OPERATING INSTRUCTIONS 4 48 ...
Page 206: ...6 MAINTENANCE Offset boom pin 10 07C803C9 17 6 16 ...
Page 207: ...6 MAINTENANCE Arm backhoe bucket 375EFD72 18 AB1F527A 19 6 17 ...
Page 298: ...8 SPECIFICATIONS Offset maximum left EACB5F36 6 See next page for the value 8 14 ...
Page 300: ...8 SPECIFICATIONS 8 16 ...