6 - MAINTENANCE
Checking the charge state of the system
1. Turn on the air conditioning system, increase engine
speed slightly (1400 to 1600 rpm) and look for bubbles
through the sight glass.
REE1U2-001
5
2. This check should be made approximately one minute
after turning on the air conditioning.
(A)
Very few bubbles observed, then transparent at first,
then whitish: "Normal".
(B)
The bubbles are numerous: check the unions and
consult your CASE CONSTRUCTION Dealer.
(C)
No bubbles are visible: check the unions and consult
your CASE CONSTRUCTION Dealer.
REE1U2-005
6
3. Check if the air-conditioning line and hose connectors
are dirty or dusty and clean them if necessary.
REE1U2-003
7
6-75
Summary of Contents for CX145C SR
Page 6: ......
Page 18: ...1 GENERAL INFORMATION 1 12 ...
Page 29: ...2 SAFETY INFORMATION E5054225_TU 4 2 11 ...
Page 132: ...3 CONTROLS INSTRUMENTS 3 82 ...
Page 160: ...4 OPERATING INSTRUCTIONS 4 Operate the arm control to unhook the tool KKZVLU 024A 14 4 28 ...
Page 180: ...4 OPERATING INSTRUCTIONS 4 48 ...
Page 206: ...6 MAINTENANCE Offset boom pin 10 07C803C9 17 6 16 ...
Page 207: ...6 MAINTENANCE Arm backhoe bucket 375EFD72 18 AB1F527A 19 6 17 ...
Page 298: ...8 SPECIFICATIONS Offset maximum left EACB5F36 6 See next page for the value 8 14 ...
Page 300: ...8 SPECIFICATIONS 8 16 ...