2 - SAFETY INFORMATION
2 - SAFETY INFORMATION
###_2_###
Safety rules
Your safety and that of people around you depends on
you. It is essential that you understand this manual for
the correct operation, inspection, lubrication and mainte-
nance of this machine.
Read this manual carefully and check that:
• You understand fully the symbols on the controls and
the safety signs used in this manual and on the ma-
chine.
• You understand fully the speed, stability, braking and
steering characteristics of the machine. If you are in any
doubt, consult your CASE CONSTRUCTION Dealer.
The safety messages in this manual concern situations
which may arise during normal machine operation and
servicing. These safety messages also indicate the dif-
ferent ways of coping with these situations. Other safety
messages are used throughout the manual to indicate
specific dangers.
Whatever type of work is being done (earthmoving, han-
dling, etc.), the safety measures for private or public work-
sites are those which conform to current regulations in the
country concerned, or the type of operation concerned (for
example: mining, quarrying, underground work).
The safety instructions given in this manual are a sum-
mary of the basic rules to be respected at all times and
do not exempt you from insurance requirements or from
abiding by the highway code.
Always keep this manual in the location provided for that
purpose (behind the operator’s seat). Make sure it is al-
ways complete and in good condition. If you wish to ob-
tain extra copies, or copies in languages other than that of
the country of use, consult your CASE CONSTRUCTION
Dealer.
YLNR3P-002
1
2-1
Summary of Contents for CX300C
Page 6: ......
Page 18: ...1 GENERAL INFORMATION 1 12...
Page 28: ...2 SAFETY INFORMATION QNTTT2 011B_TU 3 2 10...
Page 50: ...2 SAFETY INFORMATION 2 32...
Page 130: ...3 CONTROLS INSTRUMENTS 3 80...
Page 157: ...4 OPERATING INSTRUCTIONS 4 Operate the arm control to unhook the tool KKZVLU 024A 14 4 27...
Page 172: ...4 OPERATING INSTRUCTIONS 4 42...
Page 182: ...5 TRANSPORT OPERATIONS 5 10...
Page 272: ...6 MAINTENANCE 6 90...
Page 280: ...8 SPECIFICATIONS Working range 4M8ORU 002A 2 See next page for the values 8 6...
Page 282: ...8 SPECIFICATIONS 8 8...