Installation
REFLECTA/5
Page E1
Mounting & Operations Manual
Installation - Content
Installation Procedure, Overview........................................................................................................... E1
Range of Delivery .................................................................................................................................. E1
Location of Compass Binnacle, Regulative Magnetic Requirements ................................................... E2
Location of Compass Binnacle, Constructional Requirements ............................................................. E3
Optical Arrangement (Reflection Tube), Requirements for Installation................................................. E4
Compass Foundation, Cut-outs and Drillings........................................................................................ E5
Installation Optical Arrangement (Reflection Tube) .............................................................................. E6
Installation Compass Column................................................................................................................ E8
Illumination............................................................................................................................................. E9
Illumination Dimmer (Extra) ................................................................................................................... E9
Replacement of the Light Bulb .............................................................................................................. E9
Wiring................................................................................................................................................... E10
Setting into Operation, Functional Tests & Making Preparations for Adjustment ............................... E11
Installation Procedure, Overview
1. Checking range of delivery
2. Choosing location of compass binnacle with respect to magnetic interferences, constructional conditions and
applicable regulations
3. Cuting-out deck holes
4. Installing reflection tube
5. Installing compass Column
6. Connecting illumination
7. Carrying out functional tests and preparing compass adjustment
Range of Delivery
Compass Binnacle
•
Reflector reading device Column with mounting bolts, washers & gaskets, hood, magnetic steeing compass
(optional bearing compass).
Separate Correctors as extras only
•
B+C-corrector magazine (#18100), consisting of 3 magazines with 4 bar magnets 100 mm long x 10 mm
∅
(at delivery inserted in magnet magazine behind B+C-corrector).
•
D(
μ
)-Correctors (#12200)with centre pivot, glued to top cover glass of compass. Set of weak iron induction
metal plates.
•
D(cylinder)-Correctors (#12050) with mounting brackes. Mounted to port and starboard of the binnacle
column.
•
Heeling Corrector (#12800)
Reflection tube
•
Reflection tube with mirror head and fixing flange, rubber gasket and cover ring.
Accessories as options
For example spare magnetic compass. Instructions included separately as required.
Alterations / Errors reserved
Cassens & Plath GmbH, Am Lunedeich 131, 27572 Bremerhaven, Germany, Tel. +49 471 483 999 0, Fax +49 471 483 999 10
www.cassens-plath.de
, sales@cassens-plath.de