8 - 14
021505/04/11
4.2 Electrical Mounting
Use a shielded LiYCY 12 x 0,25 mm² (6 x 0,25 mm²) cable to connect the instrument electrically. Lead
the cable through the screwed cable gland and place it on the terminal strip as shown in the
connecting diagram. Ground the shielding.
After wiring of the instrument the nut of the cable gland, and screws of the housing cover are to be
screwed tightly together with the base part of the housing.
4.3 Setting of the Heating Device
On status of delivery the heating is activated. In case a deactivation should be carried out please
unscrew and remove the housing cover. Open the bridge P4 on the pc-board which is now visible.
5 Maintenance
Clean the light dome at regular intervals
– depending on the extent of soiling – with a soft cloth and
pure water (no additives).
+Vers.
GND
Ost
NO
GND
IN
OUT
Nord
Süd
West
SO
SW
NW
GND
OUT
P4
6
5
4
3
2
1
~
~
7
8
9
10
11
12
Nordseite
Lötbrücke für
Heizung ON