16–Using Cavium Teaming Services
General Network Considerations
232
83840-546-00 N
The addition of a link between the switches allows traffic to and from Blue and
Gray to reach each other without any problems. Note the additional entries in the
CAM table for both switches. The link interconnect is critical for the proper
operation of the team. As a result, you really should have a link aggregation trunk
to interconnect the two switches to ensure high availability for the connection, as
shown in
Figure 16-4. Teaming Across Switches with Interconnect