CCI.Control
CCI.Control
–
Operation
41
4.3.5
Implement
A list of the saved implements can be found under the
Implements
menu item.
The list contains implements which have been transferred from the FMIS in the
transfer file, as well as the ISOBUS implements which have been connected to the
terminal since the last import.
A task can be executed with an implement. An implement can be allocated to the
task during the planning of a task using an FMIS. If no implement is allocated to a
task, an allocation is carried out based on the task description and the implement
characteristics.
The implement data consists of
Implement name,
ISOBUS name.
Note
Only the implement name can be edited.
The remaining data serve as information only and are automatically read from the
implement if made available by it.
You have the following operating options:
Edit/Display implement
Delete implement
Note
An implement can only be edited or deleted if the data were not imported from the
FMIS.
Summary of Contents for CCI 50
Page 2: ...CCI 50 ISOBUS Terminal Operating instructions Reference Release 5 50...
Page 62: ...55 A Appendix Menu structure...
Page 64: ...CCI Cam Visual implement monitoring Operating instructions Reference CCI Cam v5...
Page 90: ...CCI Control Documentation and task management Operating instructions Reference CCI Control v4...
Page 196: ...107 10 Notes...
Page 199: ...110 Edit 38...
Page 200: ...CCI TECU Tractor data Operating instructions Reference CCI TECU v6...
Page 338: ...CCI GPS GPS settings and tractor geometry Operating instructions Reference CCI GPS v2...