CCI.TECU
– Set-up for operation
7
Pos : 5 /CC-I sobus/Auf bau @ 8\ mod_1273585112215_6. doc @ 120207 @ 12223333333332
Pos : 7 /CC-I sobus/I nst allation @ 8\ mod_1273570481145_6.doc @ 120033 @ 1223333
3 Set-up for operation
Information on the installation and power supply as well as the connection to
ISOBUS can be found in the operating instructions of your terminal.
3.1 Connecting to the signal connector
CCI.TECU evaluates the existing tractor information on the signal connector of the
tractor (speed, power take off speed, etc.) and transmits this information to all
ISOBUS implements.
A signal cable is required for connecting the terminal to the signal connector.
Signal cable
To connect the terminal to the signal connector of the tractor, proceed as follows:
1. Connect the "Signal" interface on the terminal to the signal connector using the
signal cable.
Summary of Contents for CCI 50
Page 2: ...CCI 50 ISOBUS Terminal Operating instructions Reference Release 5 50...
Page 62: ...55 A Appendix Menu structure...
Page 64: ...CCI Cam Visual implement monitoring Operating instructions Reference CCI Cam v5...
Page 90: ...CCI Control Documentation and task management Operating instructions Reference CCI Control v4...
Page 196: ...107 10 Notes...
Page 199: ...110 Edit 38...
Page 200: ...CCI TECU Tractor data Operating instructions Reference CCI TECU v6...
Page 338: ...CCI GPS GPS settings and tractor geometry Operating instructions Reference CCI GPS v2...