16
fig. 15
3. The extractor is intended to be
secured to the ceiling using the four
adjustable spring-loaded clips; these
are shown in the image below:
4. Before securing the extractor to the
ceiling, prepare and connect the
ducting as described in the ducting
section following the installation
information and ensure that the mains
electrical supply to the extractor
is connected, as described in the
electrical connection section.
5. The extractor is designed to be fitted
into a reinforcement frame fitted to
the false ceiling, as shown:
Prepare the ceiling before securing the
extractor in position.
Important:
Connect the mains power lead and
ventilation duct before locating the
extractor.
Tighten the securing clips using
fig. 14
Mi
n. 20 mm
Max. 35 mm
False ceiling (plaster)
Frame - Reinforcement
Summary of Contents for EVX101
Page 21: ...21 Typical Installation Examples ...
Page 26: ...26 ...