Hardware
Fig. 16.4
Fig. 16.3
2521
2518
2499
2473
Step 16: Roof Support Assembly
Part 2
D:
Place Roof Support Assembly with (8611) Gable Bottom on the Slide Side so the (8611) Gable Bottom sits on
top of (2527) Chalkwall Panel and (2473) Post. The supports are flush to the ends of (2527) Chalkwall Panel and
(2473) Post then attach with 1 (S3) #8 x 2-1/2” Wood Screw per side from outside the fort. (fig. 16.3, 16.4 and 16.5)
E:
From inside the assembly attach Roof Support Assembly with (8611) Gable Bottom to (2527) Chalkwall Panel
and (2473) Post using 1 Corner Bracket with 3 (S5) #8 x 1/2” Pan Screws per side. (fig. 16.3, 16.4 and 16.5)
F:
Place remaining Roof Support Assembly tight to the tops of (2521) SW Side Posts and attach with 1 (H10) 1/4 x
2-1/4” Hex Bolt (with lock washer, flat washer and t-nut) and 1 (S3) #8 x 2-1/2” Wood Screw per side. (fig. 16.3 and
16.6)
4 x
#8 x 2-1/2” Wood Screw
6 x
#8 x 1/2” Pan Screw
2 x
1/4 x 2-1/4” Hex Bolt
(1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
S3
H10
H10
1/4” Flat
Washer
1/4” Lock
Washer
1/4” T-Nut
(hidden)
S5
2 x Corner Bracket
Other Parts
2499
2499
Corner
Bracket
S5
x 3 per
bracket
Tight
2518
2499
2518
8611
8611
Tight
S3
x 2 per
side
(1 per side)
(1 per side)
2527
2527
Swing Side
Slide Side
Fig. 16.5
Fig. 16.6
50
support@cedarsummit.com
Summary of Contents for Abbeydale Clubhouse F23920
Page 90: ...NOTES 90 support cedarsummit com ...
Page 91: ...NOTES ...