D:
Make sure the Roof Assembly lays flat on each Roof Support Assembly and it overhangs both Roof Support
Assemblies by 1-1/2”. (fig. 25.4)
E:
Using the factory drilled holes as a guide attach the Roof Assembly to the centre of the Roof Support
Assemblies with 2 (S3) #8 x 2-1/2” Wood Screws per side, as shown in fig. 25.5 and 25.6.
Step 25: Attach Roof Assembly to Fort
Part 3
Fig. 25.4
Hardware
4 x
#8 x 2-1/2” Wood Screw
S3
Fig. 25.5
Fig. 25.6
Roof Support
Assembly
S3
Roof Support
Assembly
1-1/2”
1-1/2”
Factory drilled hole
Factory drilled hole
1-1/2”
1-1/2”
Roof Support Assembly
(hidden)
98
support@cedarsummitplay.com